COORDINADORA performed the critical shipment from Sadara Project, consisting of 5 HL items (plus accessories, totalling about 14,600 cbm), including items up to 629 t or 76.68 m long, from Masan Port (Korea) up to Sadara jobsite (KSA).
Our scope included the ocean transportation and road transportation at destination, apart from port operations at both ends, for which our in-house engineering department planned in detail all the technical issues to ensure the smoothest and safest operations in each stage.